The Illinois Commerce Commission's Natural Gas Pipeline Safety section inspects natural gas pipeline
facilities to assure compliance with all Federal and State safety rules and
regulations pertaining to the design, construction, operation and maintenance
of those facilities. It also investigates incidents involving natural gas
resulting in injury requiring hospitalization, a fatality, or property damage
exceeding $50,000.
Compliance Actions
Cases 
Statistics 
2012 Effingham T&Q Conference
- Pipeline Safety Web Sites Published: July 31, 2012
- Annual Incident Reports Published: July 26, 2012
- More Rules Burdeaux Published: July 26, 2012
- Recent Advisory Bulletins Published: July 26, 2012
- Reporting Requirements for Natural Gas Pipelines Published: July 26, 2012
- Distribution Integrity Management Program Published: July 26, 2012
- Effingham Presentation July 2012 Operations and Maintenance Manual Published: July 26, 2012
- Frequently Noticed Deficiencies Published: July 26, 2012
- Illinois Presentation Gerry Lee Published: July 26, 2012
- Inspection and Enforcement Published: July 26, 2012
- PHMSA Update Burdeaux Published: July 26, 2012
- PIPA Published: July 26, 2012
Code Updates 
- Current List of Laboratories and Instrumented Intial Testing Facilities Which Meet Minimum Standards to Engage in Urine Drug Testing for Federal Agencies
Published: May 3, 2013
- Random Drug Testing Rate
Published: January 18, 2012
- Control Room Management/Human Factors
Published: June 16, 2011
- Pipeline Safety: Mechanical Fitting
Published: February 1, 2011
- Updates to Pipeline and Liquefied Natural Gas Reporting Requirements
Published: December 2, 2010
- Procedures for Transportation Workplace Drug and Alcohol Testing Programs
Published: August 25, 2010
- Periodic Updates of Regulatory References to Technical Standards and Miscellaneous Edits
Published: August 11, 2010
- Incident Report Form - Gas Transmission and Gathering Published: February 23, 2010
- Instructions: Gas Distribution System Incident Form Published: February 23, 2010
- Instructions: Gas Transmission and Gathering Incident Form Published: February 23, 2010
- Incident Report Form - Gas Distribution System Published: February 23, 2010
- Integrity Management Program for Gas Distribution Pipelines
Published: December 4, 2009
- Control Room Management/Human Factors
Published: December 3, 2009
Advisory Notices 
- Workshop on Public Awareness Programs
Published: May 23, 2013
- Pipeline Safety Incident and Accident Report
Published: March 7, 2013
- Annual Reports and Validation
Published: February 11, 2013
- Accident and Incident Notification Time Limits
Published: January 31, 2013
- Reporting of Exeedances of Maximum Allowable Operating Pressure
Published: December 21, 2012
- Random Drug Testing Rate; Contractor MIS Reporting; and Obtaining DAMIS Sign-In Information
Published: December 6, 2012
- Using Meaningful Metrics in Conducting Integrity Management Program Evaluations
Published: December 5, 2012
- Communication During Emergency Situations
Published: October 11, 2012
- Inspection and Protection of Pipeline Facilities after Railway Accidents
Published: July 31, 2012
- Mechanical Fitting Failure Reporting Instructions
Published: June 12, 2012
- Verification of Records
Published: May 7, 2012
- Mandated Leak and Valve Study
Published: April 3, 2012
- Cast Iron Pipe, Supplemental Advisory Bulletin
Published: March 23, 2012
- Implementation of the National Registry of Pipeline and Liquefied Natural Gas Operators
Published: March 22, 2012
- Driscopipe 8000 High Density Polyethylene Pipe of Potential for Material Degradation
Published: March 6, 2012
- Post Accident Drug and Alcohol Testing
Published: March 6, 2012
- National Pipeline Operator Registry Advisory
Published: January 13, 2012
- Potential for Damage to Pipeline Facilities Caused by Flooding
Published: July 28, 2011
- National Pipeline Mapping System Data Submissions and Submission Dates for Gas Transmissions and Gathering Systems and Liquefied Natural Gas Annual Reports Published: May 25, 2011
- Dangers of Snow and Ice Builup
Published: February 9, 2011
- Verification of Transmission Pipeline MAOP
Published: January 10, 2011
- Emergency Preparedness Communication
Published: November 3, 2010
- Personal Electronic Device Related Distractions
Published: August 3, 2010
- Implementation of Electronic Filing For Revised Incident/Accident Report Form
Published: May 7, 2010
- 2010-3-19 FR Notice of Distribution Construction Workshop Published: March 19, 2010
- Reporting Drug and Alcohol Test Results for Contractors and Multiple Operator Identification Numbers
Published: January 20, 2010
- Operator Qualification Program Modifications
Published: December 16, 2009
- Weldable Compression Coupling Installation
Published: September 30, 2009
- Potential Low and Variable Yield Tensile Strength and Chemical Composition Properties In High Strength Line Pipe
Published: May 21, 2009
- Polymide-11 (PA-11) Plastic Pipe Design Pressures
Published: January 5, 2009
- Control Room Management/Human Factors
Published: September 16, 2008
- Integrity Management Program for Gas Distribution Pipelines
Published: September 16, 2008
- National Pipeline Mapping System Advisory Notice
Published: August 1, 2008
- Excess Flow Valve Advisory Notice
Published: June 5, 2008
- Advisory Notice: Issues Related to Mechanical Couplings Used in Natural Gas Distribution Systems
Published: March 4, 2007
Proposed Rules 
- Agency Information Collection, Gas Distribution Annual Reports
Published: February 13, 2013
- Administrative Procedures; Updates and Technical Corrections
Published: August 13, 2012
- Damage Prevention Program NPRM Comment Period Extension
Published: May 30, 2012
- Information Collection, Excess Flow Valve Census
Published: May 15, 2012
- Revisions to Transmission and Gather Pipeline Annual and Incident Report Data Collection
Published: April 19, 2012
- Pipeline Damage Prevention Programs
Published: April 1, 2012
- Comment Period Extension -Miscellaneous Changes to Pipeline Safety Regulations.
Published: February 3, 2012
- Miscellaneous Changes to Pipeline Safety Regulations
Published: December 2, 2011
- Expanding the Use of Excess Flow Valves
Published: November 28, 2011
- Advance Notice of Proposed Rulemaking - Transmission Lines
Published: August 25, 2011
- Information Collection Gas Distribution Annual Report Form
Published: July 6, 2010
- Proposed Revisions to Federal Drug Testing Custody and Control Form
Published: November 18, 2009