  • Order Entered - Suspension
    Suspension Order entered.
    11-0563 · 08/02/2011
  • Service - Order
    Copy of Suspension Order served electronically to parties.
    11-0563 · 08/03/2011
  • Filing - Appearance
    Appearance on behalf of Clarendon Water Company, filed by Howard and Howard Attorneys PLLC. (Electronic)
    11-0563 · 08/10/2011
  • Service - Setting/Prehearing Conference
    Set for status hearing by the Administrative Law Judge on September 1, 2011, in Chicago at 10:00 A.M. Notice served electronically to parties.
    11-0563 · 08/16/2011
  • Filing - Errata
    Errata (by Letter) to Direct Testimony on behalf of Clarendon Water Company, filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 08/31/2011
  • Hearing Report - Heard and Continued
    Heard by Administrative Law Judge Dolan and continued to January 25, 2012 in Chicago, at 10:00 A.M.
    11-0563 · 09/01/2011
  • Hearing Report - Administrative Law Judge Ruling
    Staff's Motion to Consolidate the dockets was granted. Staff& Intervenor's direct testimony is due by October 20, 2011. Company's rebuttal testimony is due on November 17, 2011. Staff & Intervenor's rebuttal testimony is due on December 15,2011. Company's surrebuttal testimony is due on January 5,2012. Hearings are scheduled for January 25-26,2012 at 10:00 a.m.. All Parties' initial briefs are due on February 22, 2012. Reply briefs and Proposed Orders are due on March 7, 2012.
    11-0563 · 09/01/2011
  • Transcript - Pending
    Transcript pending.
    11-0563 · 09/01/2011
  • Service - Hearing Continuance Letter
    Hearing continued by the Administrative Law Judge to January 25 & 26, 2012, in Chicago at 10:00 A.M. Notice served electronically to parties.
    11-0563 · 09/02/2011
  • Filing - Petition to Intervene
    People of the State of Illinois's Verified Petition to Intervene filed. (electronic)
    11-0563 · 09/08/2011
  • Transcript - Received
    Transcript - September 1, 2011, received.
    11-0563 · 09/16/2011
  • Filing - Petition to Intervene
    Antioch Golf Club Community Association Verified Petition for Leave to Intervene, filed by Law Offices of James C. Bakk. (Electronic)
    11-0563 · 10/03/2011
  • Order Entered - Resuspension
    Resuspension Order entered.
    11-0563 · 11/02/2011
  • Service - Order
    Copy of Resuspension Order served electronically to parties.
    11-0563 · 11/03/2011
  • Filing - Errata
    Errata to Rebuttal Testimony of Michael L. Brosch, AG Exhibits 2.0, 2.1, filed. (Electronic)
    11-0563 · 01/19/2012
  • Service - Administrative Law Judge Ruling
    Notice given by the Administrative Law Judge that the Antioch Golf Club Community Association’s Verified Petition for Leave to Intervene is granted. Notice served electronically to parties.
    11-0563 · 01/24/2012
  • Hearing Report - Heard and Continued
    Heard by Administrative Law Judge Dolan and continued to January 26, 2012, in Chicago, at 9:00 A.M.
    11-0563 · 01/25/2012
  • Hearing Report - Exhibits
    e-Docket: Charmer Water Co. Ex. 1.0- Direct testimony of Dimitry Neyzelman Charmer Water Co. Ex. 1.1- Schedules A-E. Cherry Hills Water Co. Ex. 1.0- Direct testimony of Lena Georgiev Cherry Hills Water Co. Ex.1.1- Schedules A-E Clarendon Water Company Ex. 1.0- Direct testimony of Lena Georgiev Clarendon Water Company Ex. 1.1- Schedule A-E Clarendon Water Company Ex. 1.2 Clarendon Water Company Ex. 1.4 Killarney Water Company Ex. 1.0- Direct testimony of Lena Georgiev Killarney Water Company Ex. 1.1- Schedule A-E Killarney Water Company Ex. 1.2 Killarney Water Company Ex. 1.4 Ferson Creek Utilities Company Ex. 1.0- Direct testimony of Lena Georgiev Ferson Creek Utilities Company Ex. 1.1- Schedule A-E Ferson Creek Utilities Company Ex. 1.2 Ferson Creek Utilities Company Ex. 1.4 Harbor Ridge Utilities, Inc.Ex. 1.0- Direct testimony of Lena Georgiev Harbor Ridge Utilities, Inc.Ex. 1.1- Schedule A-E Harbor Ridge Utilities, Inc.Ex. 1.2 Ex. 3.0- Rebuttal Testimony of Lena Georgiev Schedule 3.1 for Charmar Schedule 3.1 for Cherry Hills Schedule 3.1 for Clarendon Schedule 3.1 for Ferson-Water Schedule 3.1 for Ferson-Sewer Schedule 3.1 for Harbor Ridge-Water Schedule 3.1 for Harbor Ridge- Sewer Schedule 3.1 for Kilarney Ex 3.2- Tariffs (3 Parts) Ex 3.3-Charmer RC Summary Detail, Invoice Part 1&2 Ex 3.3-Cherry Hills RC Summary Detail, Invoices Part 1&2 Ex 3.3-Clarendon RC Summary Detail, Invoices Part 1&2 Ex 3.3-Ferson Creek RC Summary Detail, Invoices Part 1 &2 Ex 3.3-Harbor Ridge RC Summary Detail, Invoices Part 1&2 Ex 3.3-Killarney RC Summary Detail, Invoices Ex. 3.0 supp- Testimony of Lena Georgiev Ex 3.5 Confidential and Public with attachment Ex. 3.6 Ex. 5.0- Surrebuttal Testimony of Lena Georgiev Charmar Ex. 5.0- Schedule 5.1 CM Cherry Hills Ex. 5.0-Schedule 5.1 CH Clarendon Ex. 5.0-Schedule 5.1 CL Ferson Creek Ex. 5.0- Water Schedule 5.1 FC-W Ferson Creek Ex. 5.0- Sewer Schedule 5.1 FC-S Harbor Ridge Ex. 5.0- Water Schedule 5.1 HR-W Harbor Ridge Ex.5.0- Sewer Schedule 5.1 HR-S Kilarney Ex. 5.0 - Schedule 5.1 KL Ex 5.2- Tariffs (3 Parts) Company Rebuttal Ex 3.4 Staff Ex. 12.0 - Rebuttal of David Sackett- (Public and Confidential) Staff Ex. 12.0- Attachment A (Confidential) Staff Ex. 12.0 Attachment B Staff Ex 2.0 with schedule 2.01 thru 2.09 Staff Ex. 10.0 with Schedule 10.01 thru 10.03 Staff Ex. 17.0 Staff Ex. 4.0 Staff Ex. 18.0 Staff Ex. 6.0 Staff Ex. 13.0 Staff Ex. 19.0 Staff Ex. 7.0 Staff Ex. 14.0 Staff Ex. 20.0 Staff Ex. 16.0 Staff Ex. 22.0 ALL FILED ON E-DOCKET
    11-0563 · 01/25/2012
  • Hearing Report - Exhibits
    Staff Cross Exhibit 1 - Confidential.
    11-0563 · 01/25/2012
  • Transcript - Pending
    Transcript pending.
    11-0563 · 01/25/2012
  • Hearing Report - Heard and Continued
    Heard by Administrative Law Judge Dolan and continued generally.
    11-0563 · 01/26/2012
  • Hearing Report - Exhibits
    e-Docket: AG. Ex. 1.0- Direct testimony of Michael Brosch AG Ex. 1.1 thru 1.7 AG Ex. 2.0 (revised ) AG Ex. 2.1 (revised) AG Ex. 2.2 thru 2.5 Staff Ex. 1.0 with attached Schedules Staff Ex. 9.0 with attached Schedules Staff Ex. 3.0 Staff Ex. 3.01 thru 3.04 Staff Ex. 5.0 Staff Ex. 5.01 thru 5.10 Staff Ex. 11.0 Staff Ex. 8.0 Staff Ex.15.0 Staff Ex. 21.0 Charmer Water Co. Ex. 2.0. Cherry Hills Water Co. Ex. 2.0 Clarendon Water Company Ex. 2.0 Killarney Water Company Ex. 2.0 Ferson Creek Utilities Company Ex. 2.0 Harbor Ridge Utilities, Inc.Ex. 2.0 Company Ex. 4.0 Company Ex.4.1 ALL FILED ON E-DOCKET
    11-0563 · 01/26/2012
  • Hearing Report - Exhibits
    AG Cross Ex. 2- admitted Staff Group Ex. 1- Confidential- admitted.
    11-0563 · 01/26/2012
  • Transcript - Pending
    Transcript pending.
    11-0563 · 01/26/2012
  • Service - Notice
    Notice given that a public forum is scheduled for the following location, date and time: Algonquin Township Hall, 3702 U.S. Rt. Hwy 14, Crystal Lake, Illinois on March 6, 2012, at 7:00 P.M – 10:00 P.M. The forum is for the purpose of receiving public comment concerning the proposed increase in water rates proposed by Killarney Water Company. While one or more members of the Commission might attend, a Commission staff member, serving as a public forum officer, will preside. Any questions or concerns regarding a public forum may be directed to Robert Bensko, Homeland Security Director, Illinois Commerce Commission, at 217/524-5049. Notice served electronically to parties.
    11-0563 · 02/06/2012
  • Transcript - Received
    Transcript - January 25, 2012, received.
    11-0563 · 02/09/2012
  • Transcript - Received
    Transcript - January 26, 2012, received.
    11-0563 · 02/10/2012
  • Briefs - Initial
    Initial Brief of the Staff of the Illinois Commerce Commission, filed. (Electronic)
    11-0563 · 02/22/2012
  • Briefs - Initial
    Initial Brief of the People of the State of Illinois, filed. (Electronic)
    11-0563 · 02/22/2012
  • Briefs - Initial
    Initial Brief on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc., filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 02/22/2012
  • Filing - Motion
    Staff Motion to Strike Portions of the AG's Initial Brief, filed. (Electronic)
    11-0563 · 02/24/2012
  • Service - Notice
    Notice given that a public forum is scheduled for the following location, date and time: Warren Township Center, 17801 W. Washington St., Gurnee, Illinois on March 28, 2012, at the hour of 7:00 P.M. The forum is for the purpose of receiving public comment concerning the proposed increase in water rates proposed by Charmar Water Company. While one or more members of the Commission might attend, a Commission staff member, serving as a public forum officer, will preside. Any questions or concerns regarding a public forum may be directed to Robert Bensko, Homeland Security Director, Illinois Commerce Commission, at 217/524-5049. Parties advised electronically.
    11-0563 · 02/28/2012
  • Briefs - Reply/Response
    Reply Brief of the People of the State of Illinois, filed. (Electronic)
    11-0563 · 03/07/2012
  • Briefs - Reply/Response
    Staff's Reply Brief, filed. (Electronic)
    11-0563 · 03/07/2012
  • Briefs - Reply/Response
    Reply Brief on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc., filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 03/07/2012
  • Filing - Draft/Suggested Order
    Draft Order, filed by Howard & Howard Attorneys PLLC on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc. (Electronic)
    11-0563 · 03/09/2012
  • Filing - Opposition
    The People of The State of Illinois’ Opposition to the Staff Motion to Strike Portions of the AG’s Initial Brief, filed. (Electronic)
    11-0563 · 03/09/2012
  • Filing - Motion
    The People of the State of Illinois’ Request for Leave to File Instanter, filed. (Electronic)
    11-0563 · 03/09/2012
  • Filing - Reply
    Staff Reply to the AG'S Opposition to the Staff Motion to Strike Portions of the AG'S Initial Brief, filed. (Electronic)
    11-0563 · 03/16/2012
  • Service - Administrative Law Judge Ruling
    Notice given by the Administrative Law Judge that Staff’s Motion to Strike portions of the Attorney General’s Initial Brief that quoted public comments is granted. Both public comments made at Illinois Commerce Commission conducted public forums and comments posted to the Commission website must be made available to the Administrative Law Judge and the Commission and reviewed when rendering a decision. However, the availability of the comments and review thereof by the Administrative Law Judge and the Commission does not, in and of itself, make the comments a part of the record of evidence. Notice served electronically to parties.
    11-0563 · 03/20/2012
  • Service - Administrative Law Judge Ruling
    Notice given that the matter was marked “Heard and Taken” by the Administrative Law Judge on April 5, 2012. Notice served electronically to parties.
    11-0563 · 04/06/2012
  • Service - Proposed Order
    Proposed Order served electronically to parties.
    11-0563 · 04/06/2012
  • Transcript - Received
    PUBLIC FORUM Transcript - March 28, 2012, received.
    11-0563 · 04/11/2012
  • Briefs - On Exceptions
    Brief on Exceptions of the Staff of the Illinois Commerce Commission, filed. (Electronic)
    11-0563 · 04/20/2012
  • Briefs - On Exceptions
    Brief on Exceptions and Exceptions of the People of the State of Illinois, filed. ORAL ARGUMENT REQUESTED. (Electronic)
    11-0563 · 04/20/2012
  • Briefs - On Exceptions
    Brief on Exceptions on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc., filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 04/20/2012
  • Filing - Motion
    Staff Motion to Strike Portions of the AG's BOE, filed. (Electronic)
    11-0563 · 04/25/2012
  • Briefs - Reply to Exceptions
    Reply Brief on Exceptions of the Staff of the Illinois Commerce Commission, filed. (Electronic)
    11-0563 · 04/27/2012
  • Briefs - Reply to Exceptions
    Reply Brief on Exceptions of the People of the State of Illinois, filed. (Electronic)
    11-0563 · 04/27/2012
  • Briefs - Reply to Exceptions
    Reply Brief on Exceptions on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc., filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 04/27/2012
  • Service - Notice
    Notice given by the Administrative Law Judge that Oral Argument is scheduled for May 7, 2012, in Chicago at 1:00 P.M. Notice also given by the Administrative Law Judge of the attached Oral Argument instructions. Notice served electronically to parties.
    11-0563 · 04/30/2012
  • Service - Administrative Law Judge Ruling
    Notice given by the Administrative Law Judge that any response to Staff’s Motion to Strike Portions of the AG’s BOE is due by Wednesday May 2, 2012. Any reply to the response is due by Friday, May 4, 2012. Notice served electronically to parties.
    11-0563 · 04/30/2012
  • Service - Notice
    Notice given by the Administrative Law Judge of the attached instructions for Oral Argument. Notice served electronically to parties.
    11-0563 · 05/01/2012
  • Filing - Opposition
    The People of the State of Illinois’ Opposition to the Staff Motion to Strike Portions of the AG’s Brief on Exceptions, filed. (Electronic)
    11-0563 · 05/02/2012
  • Filing - Reply
    Staff Reply to the AG’s Opposition to the Staff Motion to Strike Portions of the AG’s Brief on Exceptions, filed. (Electronic)
    11-0563 · 05/04/2012
  • Commission Action - Oral Argument
    Oral Argument Heard by the Commission and Taken under Advisement.
    11-0563 · 05/07/2012
  • Service - Notice
    Notice given by the Administrative Law Judge of the attached Post-Record Data Request. Parties advised electronically.
    11-0563 · 05/08/2012
  • Service - Administrative Law Judge Ruling
    Notice given by the Administrative Law Judge that Staff's Motion to Strike Portions of the AG's Brief on Exceptions is granted. Any direct quote of a public comment is stricken. Parties advised electronically.
    11-0563 · 05/08/2012
  • Filing - Response
    People of the State of Illinois’ Response to Post Record Data Request, filed. (Electronic)
    11-0563 · 05/16/2012
  • Order Entered - Final
    Final Order entered.
    11-0563 · 05/22/2012
  • Service - Order
    Copy of Final Order served electronically to parties.
    11-0563 · 05/23/2012
  • Transcript - Received
    ORAL ARGUMENT Transcript - May 7, 2012, received.
    11-0563 · 05/29/2012
  • Filing - Petition for Rehearing
    Application for Rehearing on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc., filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 06/21/2012
  • Filing - Compliance
    Compliance Report pursuant to Order filed by Howard & Howard Attorneys PLLC. (electronic)
    11-0563 · 07/06/2012
  • Commission Action - General
    The Commission in conference GRANTED the Application for Rehearing and DENIED the Request to Stay made within the Application for Rehearing on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc., filed on June 21, 2012.
    11-0563 · 07/11/2012
  • Service - Commission Action
    Notice of Commission Action served electronically to parties advising of the action of the Commission on July 11, 2012.
    11-0563 · 07/12/2012
  • Filing - Compliance
    Compliance Filing pursuant to Order entered on May 22, 2012 filed by Howard & Howard Attorneys PLLC. (electronic)
    11-0563 · 07/17/2012
  • Service - Setting/Prehearing Conference
    Set for status hearing by the Administrative Law Judge on July 26, 2012, in Chicago at 10:00 A.M. Notice served electronically to parties.
    11-0563 · 07/20/2012
  • Filing - Appearance
    Additional Appearance filed on behalf of the People of the State of Illinois. (electronic)
    11-0563 · 07/24/2012
  • Transcript - Pending
    Transcript Pending.
    11-0563 · 07/26/2012
  • Hearing Report - Heard and Continued
    Heard by Administrative Law Judge Dolan and continued to October 2, 2012, in Chicago at 10:00 A.M.
    11-0563 · 07/26/2012
  • Hearing Report - Administrative Law Judge Ruling
    Company's Direct testimony is due by August 9, 2012; Staff and Intervenor's testimony is due on September 11, 2012; Company's rebuttal testimony is due on September 24, 2012, All parties initial briefs are due on October 16, 2012, Reply Briefs are due on October 23, 2012. By agreement of all parties, data request responses are due 1 week from when they are received.
    11-0563 · 07/26/2012
  • Service - Hearing Continuance Letter
    Hearing continued by the Administrative Law Judge to October 2, 2012, in Chicago at 10:00 A.M. Notice served electronically to parties.
    11-0563 · 07/27/2012
  • Transcript - Received
    Transcript - July 26, 2012, received.
    11-0563 · 08/09/2012
  • Filing - Motion
    People of the State of Illinois' Motion to Compel Responses to AG Data Requests to UI Companies on Rehearing, filed. (Electronic)
    11-0563 · 08/30/2012
  • Filing - Response
    Response to Motion to Compel, filed by Howard & Howard Attorneys PLLC on behalf of Charmar Water Company, Cherry Hill Water Company, Clarendon Water Company, Killarney Water Company, Ferson Creek Utilities Company, and Harbor Ridge Utilities, Inc. (Electronic)
    11-0563 · 09/13/2012
  • Filing - Reply
    People of the State of Illinois' Reply to the Companies' Response to the People's Motion to Compel Responses to AG Data Requests, filed. (Electronic)
    11-0563 · 09/20/2012
  • Service - Administrative Law Judge Ruling
    Notice given by the Administrative Law Judge that the People of the State of Illinois’s Motion to Compel Responses to AG Data Requests to UI Companies is denied. While the Commission is interested in more information concerning the rate case expense of the Companies, the request of the Attorney General’s office is overly broad, burdensome and information of other regulated Utilities Inc. in other jurisdictions is not relevant to these rehearing proceedings. Parties advised electronically.
    11-0563 · 09/21/2012
  • Hearing Report - Heard and Continued
    Heard by Administrative Law Judge Dolan and continued generally.
    11-0563 · 10/02/2012
  • Hearing Report - Exhibits
    Companies' Ex. 1.0- Direct Testimony on Rehearing of Lena Georgiev-admitted; Companies' Ex. 1.1- admitted; Companies' 2.0- Rebuttal Testimony on Rehearing of Lena Georgiev-admitted; Companies' 2.1- admitted Companies' 3.0- Affidavit of Lena Georgiev-admitted (Late filed exhibit) Staff Ex. 17.0- Direct Testimony on Rehearing of Dianna Hathhorn- admitted; Staff Ex. 17.1- Affidavit of Dianna Hathhorn- admitted. AG Ex. 3.0- Direct Testimony on Rehearing of Michael Brosch- admitted; AG Ex. 3.1-3.3- admitted; AG ex. 4.0- Affidavit of Michael Brosch- admitted (Late filed exhibit).
    11-0563 · 10/02/2012
  • Hearing Report - Administrative Law Judge Ruling
    Post hearing briefs are due by October 16, 2012. Reply Briefs are due by October 23, 2012.
    11-0563 · 10/02/2012
  • Transcript - Pending
    Transcript pending.
    11-0563 · 10/02/2012
  • Service - Hearing Continuance Letter
    Notice given by the Administrative Law Judge that the hearing has been continued generally. Notice served electronically to parties.
    11-0563 · 10/05/2012
  • Filing - Compliance
    Compliance Filing on behalf of Charmar Water Company, Clarendon Water Company, Cherry Hill Water Company, Killarney Water Co., Harbor Ridge Utilities, Inc. and Ferson Creek Utilities Company, filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 10/12/2012
  • Briefs - Initial
    Initial Brief on Rehearing of the Staff of the Illinois Commerce Commission, filed. (Electronic)
    11-0563 · 10/16/2012
  • Briefs - Initial
    Initial Brief on Rehearing on behalf of Charmar Water Company, Clarendon Water Company, Cherry Hill Water Company, Killarney Water Co., Harbor Ridge Utilities, Inc. and Ferson Creek Utilities Company, filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 10/16/2012
  • Briefs - Initial
    Initial Brief on Rehearing of the People of the State of Illlinois, filed. (Electronic)
    11-0563 · 10/16/2012
  • Transcript - Received
    Transcript - October 2, 2012, received.
    11-0563 · 10/17/2012
  • Briefs - Reply/Response
    Reply Brief on Rehearing of the Staff of the Illinois Commerce Commission, filed. (Electronic)
    11-0563 · 10/23/2012
  • Briefs - Reply/Response
    Reply Brief on Rehearing on behalf of Charmar Water Company, Clarendon Water Company, Cherry Hill Water Company, Killarney Water Co., Harbor Ridge Utilities, Inc. and Ferson Creek Utilities Company, filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 10/23/2012
  • Briefs - Reply/Response
    Reply Brief on Rehearing of the People of the State of Illinois, filed. (Electronic)
    11-0563 · 10/23/2012
  • Filing - Compliance
    Supplemental Compliance Filing filed by Howard & Howard Attorneys PLLC on behalf of Charmar Water Company, Clarendon Water Company, Cherry Hill Water Company, Killarney Water Co., Harbor Ridge Utilities Inc. and Ferson Creek Utilities Company. (electronic)
    11-0563 · 10/31/2012
  • Service - Proposed Order
    Attached Proposed Order on Rehearing served electronically to parties.
    11-0563 · 11/14/2012
  • Briefs - On Exceptions
    Brief on Exceptions on Rehearing of the People of the State of Illinois, filed. (Electronic)
    11-0563 · 11/20/2012
  • Briefs - On Exceptions
    Brief on Exceptions on Rehearing of the Staff of the Illinois Commerce Commission, filed. (Electronic)
    11-0563 · 11/21/2012
  • Briefs - On Exceptions
    Rehearing Brief on Exceptions on behalf of Charmar Water Company, Clarendon Water Company, Cherry Hill Water Company, Killarney Water Co., Harbor Ridge Utilities, Inc. and Ferson Creek Utilities Company, filed by Howard & Howard Attorneys PLLC. (Electronic)
    11-0563 · 11/21/2012
  • Order Entered - On Rehearing
    Order on Rehearing entered.
    11-0563 · 11/28/2012
  • Service - Order
    Copy of Order on Rehearing served electronically to parties.
    11-0563 · 11/29/2012
  • Filing - Compliance
    Supplement Compliance Filing Report Update, filed by Howard & Howard Attorneys PLLC on behalf of Charmar Water Company, Clarendon Water Company, Cherry Hill Water Company, Killarney Water Co., Harbor Ridge Utilities Inc. and Ferson Creek Utilities Company. (Electronic)
    11-0563 · 01/22/2013

 
 